Sr. No
1
2
3
4
5
6
7
8
9
10
11
Name of the Laboratory
Surveying
Concrete technology
Bacis Civil Engg
Engg. Geology
Applied Mechanics
AutoCAD
Strength of Material
Fluid Mechanics
Environment Engg.
Geo-tech Engineering
Transportation Engineering
Lab Incharge
Ms.Patil S.R.
Mr. Gidd M. M.
Ms. Shinde G. S.
Ms. Mane A.A.
Ms. Mali S. S.
Ms. Patil S. M.
Mr. Patil R. R.
Ms. Pawar S. G.
Ms. Pujari S. S.
Mrs. Kadam J. R.
Mr. Chivate O. C.
Lab Area(Sq.M.)
75.08
75.08
75.08
75.08
75.08
75.08
75.08
75.08
75.08
75.08
75.08
Total Instrument Cost in Rs.
1,59,570=00
2,42,718=00
1,36,506=00
5,34,639=00
4,36,506=00
1,32,336=00
4,16,516=00
2,86,506=00
2,33,300=00
2,00,000=00
3,00,000=00
Total investment cost in academic year 2013-14 till date : Rs 26,66,810/-